Kokkolan Satama
2003-2004
7.5 ME
TYL
Klaus Svenfors
Construction of the AW-terminal at the Port of Kokkola. The terminal is one-of-a-kind in Finland, which gives ships the possibility to be loaded while being protected from harsh weather. 80 000 m3 dredging, 100 000 m3 filling, 84 concrete pier prefabs, 4 concrete dolhpins, 322m of new quay, 100m dolphin structures, concrete casting 8300 m3.