Kokkolan biogasplant
Kirkkolehto Wetland Restoration Project
Nature-based wetland project to improve water quality and biodiversity. Includes excavation, sedimentation basin, landscape work, and collaboration with the City of Kokkola. Executed by Tallqvist as main contractor.
Construction of the Halkokari Roundabout
Full contract project completed in 2020. Phased construction with night work to minimize traffic disruption. Improved flow and safety for heavy transport and special loads in an industrial area.
All-weather Terminal construction- and offshore works
A covered dock where ships kan be loaded while being protected from harsh weather.
Environmental construction Murikankoski
Tallqvist has executed several rapid refurbishment contracts, ie. Murikankoski at Perho River.
Sports field construction
We've built a great place for football and track-and-field in our neighbour city.
Villa primary school, renovation and extension
Villa School renovation extended the lifespan of the over 150-year-old school building.
Tankkari II Residential Complex
Three modern two-storey residential buildings, 85 apartments, completed as main contractor. High-quality housing solutions with durable concrete structures, brick facades, and standing seam roofs.
Busines premises, Motopark
Motopark is a 3300 m2 business premises located in the fast-developing Heinolankaari, Kokkola. Tallqvist Infra worked as the general contractor for the project.
Tuotantotilat, Kewatec Aluboat Oy Ab, Kokkola
Tallqvist constructed a production facility for Kewatec aluboat, which produces aluminium boats.
Our strengths